CDCS is the advance level for Data Center Professionals and this 3-day course will further increase attendees to a level being a compatible sparring partner with suppliers and they will be able to verify offers provided by vendors for correctness, effectiveness and efficiency. CDCS is the second training in the EPI Design and Build training track under the EPI Data Center Training Framework. Participants must hold a valid CDCP certificate in order to be able to register for the CDCS class. CDCS itself is a pre-requisite for persons wishing to achieve the CDCE status.
Objectives
Data Center Design/Life Cycle Overview
- Overview of the phases of a data center life cycle
- Planning, re-alignment and continuous improvement
Standards and Rating Level Definitions
- Rating level history
- Difference between Uptime and TIA-942
- Rating level definitions
- Redundancy options (N+1), 2N, 2(N+1)
- Concurrent Maintainability/Compartmentalisation
- Example configurations
- Substation and feed requirements
- Maintenance options
- Operational processes guidelines/standards
- Skill development
Building Considerations
- Building location considerations
- Floor and hanging loads requirements
- Fire rating for walls and glass
- Blast protection
- Bullet proofing
- Forced entry protection
Advanced Raised Floor & Suspended Ceiling
- Raised floor installation guidelines
- Techniques to install a proper and leveled raised access floor
- Common mistakes
- Choosing the right tiles and their locations
- Seismic-mitigating floor constructions
- Choosing the correct suspended ceiling
Advanced Power
- Power infrastructure layout;
- Formulas which you should know for the data center
- Single Line Electrical diagrams; how to read to ensure key components are present for protection
- Over current protection devices (MCB/MCCB/VCB/ACB/Fuses) definitions and what to use where
- Earth Leakage devices (RCB/RCD/ELCB/GFCI/ALCI/RCBO), definitions and what to use where
- Sizing of protective components
- Lightning strikes and surge protection devices (TVSS/SPD), how they operate, where to use and how to install
- Power cabling and cable run considerations
- PDU/DB setup and minimum requirements
- Generators;
- Generator types: Standy/Prime/Continuous
- Component make up and functions
- Fuel storage and calculation
- Paralleling of gen-sets
- Generator room/area requirements
- UPS Systems;
- Required specifications for UPS systems
- How to read data sheets and select the correct UPS
- Requirements for parallel configurations and avoid pitfalls such as single point of failures
- How parallel installation should be done, classic mistakes made by installers and how to avoid these
- Harmonic Filters;
- Active/Passive filters and their application
- Battery Banks;
- Battery bank terminology
- Designing battery banks, how to calculate, and double check the battery bank to be installed
- Battery charging pitfalls and ensuring the right charger is being installed and used
- Using parallel battery banks; how to properly install them, limitations and risks when using batteries in parallel
- How to test batteries correctly and make decisions on cell/block or string replacement
- Battery casing choices; ABS, V0, V1, V2
- Alternative energy storage; flywheel, re-usable cell, compressed air UPS, etc.
Advanced Electro Magnetic Fields
- Sources of EMF
- Difference between single, three phase and bus-bar EMF
- Options available to measure EMF and how to interpret the results from single-axes and composite measurements
- Guidance on safe distance for equipment and humans
- Calculation of EMF attenuation factor for shielding material permeability and saturation factors
Advanced Cooling
- Important definitions; dry-bulb, wet-bulb, dew-point, RH, sensible and latent heat
- Psychometric chart and ASHRAE recommendations
- Environmental class definitions and thermal specifications
- Temperature/humidity measurements guideline
- Heat dissipation methods
- Altitude impact on temperature intake to ICT equipment
- Floor plan setup for effective cooling
- Differences in tile surface and supporting structure and the air-flow performance impact
- Rack door construction and the flow performance impact
- Equipment Delta-T and its impact
- Optimising airflow
- Thermal units conversions
- Calculations for air volume displacement (CFM/CMH)
- Cooling capacity calculations
- Air-conditioning selection
- De- / humidifying options
- Air conditioning efficiency
- SHR impact on cost saving
- Efficiency indicator
- New cooling principle and techniques (Submerged, VSD/VRF/ECF/water- and air side economisers)
- Redundancy guidelines for air-conditioners avoiding classic misconceptions and mistakes for meeting ANSI/TIA-942 compliant designs
- Installation requirements
- Connections to fire panel and EPO
- Commissioning of air conditioners
- Set points and calibration
- CFD (Computational Fluid Dynamics)
Advanced Fire Protection
- The fire triangle and elements to stop a fire
- Detection systems in detail (VESDA, VIEW, smoke sensors)
- Considerations for installation of sensors
- Proper testing of smoke sensors
- Water based systems i.e. deluge, wet-pipe, dry-pipe, pre-action and why most of them don't work and how to detect this
- Details on Inert and Halocarbon systems and how to select the correct system for your data center
- How to calculate the gas content ensuring the appropriate level is installed to suppress the fire including safety considerations
- Other requirements for gas systems such as release times, hold times, pipe install requirements and other important factors
- Requirements for the fire detection panel
- Installation verification, methods, what to check and how
- New advanced fire suppression technologies
Design and Install Scalable Networking Cabling System
- ANSI/TIA942 cabling structure topology
- ToR, EoR Design
- Intelligent patching systems
- Installation best practice such as routing, bending radius, separation from power, containment fill ratio, fiber link loss calculator, bonding and grounding requirement
- Standard for telecommunications labeling and administration
Environmental Specifications and Contamination Control
- Acoustic noise effects, regulations, specifications and limits
- Data center contaminations and classifications
- Measurements, standards and limits
- Preventive measures and avoidance
Data Center Effciency
- Business drivers to go Green
- High-availability or Green?
- Green guidelines and standards
- How to measure it and what are acceptable numbers compared to the general industry
- PUE classes defined by Green Grid and issues with PUE
- Techniques for saving energy in all parts of the data center i.e. application/system level, cooling, power distribution
Audience
The primary audience for this course is an IT, Facilities or Data Center Operations professional working in and around the data center (representing both end-customers and/or service provider/facilitators) and having responsibility to achieve and improve hi-availability and manage ability of the data center, such as: Data Center Managers, Operations / Floor / Facility Managers, Data Center Engineers, Network/System Engineers, Data Center Sales/Consultants.
Prerequisites
Participants must hold a valid CDCP certificate in order to be able to register for the CDCS class.
Topics
Data center Design/Life Cycle Overview
- Overview of the phases of a data center life cycle
- Planning, re-alignment and continuous improvement
Standards and Rating Level Definitions
- Rating level history
- Difference between Uptime and TIA-942
- Rating level definitions
- Redundancy options (N+1), 2N, 2(N+1)
- Concurrent Maintainability/Compartmentalisation
- Example configurations
- Substation and feed requirements
- Maintenance options
- Operational processes guidelines/standards
- Skill development
Building Considerations
- Building location considerations
- Floor and hanging loads requirements
- Fire rating for walls and glass
- Blast protection
- Bullet proofing
- Forced entry protection
Advanced Raised Floor & Suspended Ceiling
- Raised floor installation guidelines
- Techniques to install a proper and leveled raised access floor
- Common mistakes
- Choosing the right tiles and their locations
- Seismic-mitigating floor constructions
- Choosing the correct suspended ceiling
Advanced Power
- Power infrastructure layout;
- Formulas which you should know for the data center
- Single Line Electrical diagrams; how to read to ensure key components are present for protection
- Over current protection devices (MCB/MCCB/VCB/ACB/Fuses) definitions and what to use where
- Earth Leakage devices (RCB/RCD/ELCB/GFCI/ALCI/RCBO), definitions and what to use where
- Sizing of protective components
- Lightning strikes and surge protection devices (TVSS/SPD), how they operate, where to use and how to install
- Power cabling and cable run considerations
- PDU/DB setup and minimum requirements
- Generators;
- Generator types: Standy/Prime/Continuous
- Component make up and functions
- Fuel storage and calculation
- Paralleling of gen-sets
- Generator room/area requirements
- UPS Systems;
- Required specifications for UPS systems
- How to read data sheets and select the correct UPS
- Requirements for parallel configurations and avoid pitfalls such as single point of failures
- How parallel installation should be done, classic mistakes made by installers and how to avoid these
- Harmonic Filters;
- Active/Passive filters and their application
- Battery Banks;
- Battery bank terminology
- Designing battery banks, how to calculate, and double check the battery bank to be installed
- Battery charging pitfalls and ensuring the right charger is being installed and used
- Using parallel battery banks; how to properly install them, limitations and risks when using batteries in parallel
- How to test batteries correctly and make decisions on cell/block or string replacement
- Battery casing choices; ABS, V0, V1, V2
- Alternative energy storage; flywheel, re-usable cell, compressed air UPS, etc.
Advanced Electro Magnetic Fields
- Sources of EMF
- Difference between single, three phase and bus-bar EMF
- Options available to measure EMF and how to interpret the results from single-axes and composite measurements
- Guidance on safe distance for equipment and humans
- Calculation of EMF attenuation factor for shielding material permeability and saturation factors
Advanced Cooling
- Important definitions; dry-bulb, wet-bulb, dew-point, RH, sensible and latent heat
- Psychometric chart and ASHRAE recommendations
- Environmental class definitions and thermal specifications
- Temperature/humidity measurements guideline
- Heat dissipation methods
- Altitude impact on temperature intake to ICT equipment
- Floor plan setup for effective cooling
- Differences in tile surface and supporting structure and the air-flow performance impact
- Rack door construction and the flow performance impact
- Equipment Delta-T and its impact
- Optimising airflow
- Thermal units conversions
- Calculations for air volume displacement (CFM/CMH)
- Cooling capacity calculations
- Air-conditioning selection
- De- / humidifying options
- Air conditioning efficiency
- SHR impact on cost saving
- Efficiency indicator
- New cooling principle and techniques (Submerged, VSD/VRF/ECF/water- and air side economisers)
- Redundancy guidelines for air-conditioners avoiding classic misconceptions and mistakes for meeting ANSI/TIA-942 compliant designs
- Installation requirements
- Connections to fire panel and EPO
- Commissioning of air conditioners
- Set points and calibration
- CFD (Computational Fluid Dynamics)
Advanced Fire Protection
- The fire triangle and elements to stop a fire
- Detection systems in detail (VESDA, VIEW, smoke sensors)
- Considerations for installation of sensors
- Proper testing of smoke sensors
- Water based systems i.e. deluge, wet-pipe, dry-pipe, pre-action and why most of them don't work and how to detect this
- Details on Inert and Halocarbon systems and how to select the correct system for your data center
- How to calculate the gas content ensuring the appropriate level is installed to suppress the fire including safety considerations
- Other requirements for gas systems such as release times, hold times, pipe install requirements and other important factors
- Requirements for the fire detection panel
- Installation verification, methods, what to check and how
- New advanced fire suppression technologies
Design and Install Scalable Networking Cabling System
- ANSI/TIA942 cabling structure topology
- ToR, EoR Design
- Intelligent patching systems
- Installation best practice such as routing, bending radius, separation from power, containment fill ratio, fiber link loss calculator, bonding and grounding requirement
- Standard for telecommunications labeling and administration
Environmental Specifications and Contamination Control
- Acoustic noise effects, regulations, specifications and limits
- Data center contaminations and classifications
- Measurements, standards and limits
- Preventive measures and avoidance
Data center Effciency
- Business drivers to go Green
- High-availability or Green?
- Green guidelines and standards
- How to measure it and what are acceptable numbers compared to the general industry
- PUE classes defined by Green Grid and issues with PUE
- Techniques for saving energy in all parts of the data center i.e. application/system level, cooling, power distribution
Related Courses
-
CDCP - Certified Data Center Professional
CDCP-EPI- Duration: 2 Days
- Delivery Format: Classroom Training, Online Training
- Price: 2,100.00 USD
-
CDCE - Certified Data Center Expert
CDCE-EPI- Duration: 5 Days
- Delivery Format: Classroom Training, Online Training
- Price: 4,800.00 USD
Self-Paced Training Info
Learn at your own pace with anytime, anywhere training
- Same in-demand topics as instructor-led public and private classes.
- Standalone learning or supplemental reinforcement.
- e-Learning content varies by course and technology.
- View the Self-Paced version of this outline and what is included in the SPVC course.
- Learn more about e-Learning
Course Added To Shopping Cart
bla
bla
bla
bla
bla
bla
Self-Paced Training Terms & Conditions
Exam Terms & Conditions
Sorry, there are no classes that meet your criteria.
Please contact us to schedule a class.
STOP! Before You Leave
Save 0% on this course!
Take advantage of our online-only offer & save 0% on any course !
Promo Code skip0 will be applied to your registration
Purchase Information
title
Please take a moment to fill out this form. We will get back to you as soon as possible.
All fields marked with an asterisk (*) are mandatory.